Encroachment Permit:

Required Submittals:

- Traffic control plan. Plan must comply with MUTCD standards. 

- Site plan – Must show a detailed map with the location address. If installing anything in the public right of way, exact location and dimensions are required.

- Project Narrative – Must include in writing a detailed description of the work to be performed. Current copy of -contractor’s license to be kept with the file

- Current COI must be submitted. A minimum $1,000,000.00 insurance policy naming Vineyard City as beneficiary.

- Appropriate bonding must be in place. The bond amount will be assessed based on the specifics of the project.

- If cutting into the asphalt more than a 1’x1’ bore pit, it must have an approved patch within 48 hours of completion of work